Fortbildungsveranstaltung gemäß ChemOzonSchichtV anerkennen lassen
Inhalt
Begriffe im Kontext
Fachlich freigegeben am
Fachlich freigegeben durch
- Verordnung über Stoffe, die die Ozonschicht schädigen (Chemikalien-Ozonschichtverordnung – ChemOzonSchichtV)
- Laufende Nummer 24 Tarifstelle 8 Zehntes Sächsisches Kostenverzeichnis (SächsKVZ)
- § 42a Absatz 2 Satz 2 bis 4 Verwaltungsverfahrensgesetz (VwVfG)
The required expertise of persons who carry out certain work - such as the recovery or take-back of ozone-depleting refrigerants and the inspection and maintenance of containing equipment - is demonstrated, among other things, by participation in a training course. This training course must be recognised by the competent authority.
Single point of contact (Einheitlicher Ansprechpartner)
You can utilise the service of the Single Point of Contact for this procedure. They will guide you through the procedure, take care of correspondence with all the authorities responsible for your request and provide you with expert advice.
The following documents must be enclosed with the application:
- curriculum for the training event
- list of measuring instruments and equipment required for the practical teaching of skills and knowledge
- sample of proof of participation in the training event
- list of instructors with details of their qualifications
The training event to be recognised must impart the knowledge required for the respective area of responsibility. This includes knowledge of
- system technology
- the relevant regulations, directives and generally recognised rules of technology, and
- the essential properties of the substances and preparations/mixtures concerned and the hazards associated with their use.
You submit the application informally.
- The Saxony State Directorate will check that the application documents are complete and correct.
- If all requirements are met, it will recognise the training event.
- If necessary, it may request missing documents.
If you have any questions about the procedure, please contact the Saxony State Directorate.
- Processing time of the competent authority: maximum three months
Note: The period begins with the receipt of the complete documents. It can be extended once if this is justified due to the difficulty of the matter.