Errichtung, wesentliche Änderung oder Maßnahmen mit Änderung der Gefährdungsstufe von Heizölverbraucheranlagen nach AwSV anzeigen
Inhalt
Begriffe im Kontext
- Erlangung von Lizenzen, Genehmigungen oder Zulassungen im Hinblick auf die Gründung und Führung eines Unternehmens
- Anmeldepflichten (2010100)
- Abfall, Schadstoffe und Emissionen (2130100)
- Tier-, Pflanzen- und Naturschutz (2130200)
Fachlich freigegeben am
Fachlich freigegeben durch
If you want to set up or significantly change a heating oil consumer system or take measures that result in a change in the hazard level, you must notify us.
You must submit your notification of the installation, significant modification or change to the hazard level of a heating oil consumer system to the competent authority in good time beforehand. The installation of these systems does not have to be notified if
- a suitability assessment has been applied for for this installation in accordance with the Water Resources Act or
- the installation is the subject of an approval procedure under other legislation, provided that the approval procedure also ensures compliance with the requirements of this Ordinance. In this case, significant changes to the installation that require approval are also not subject to notification.
- Completed notification form
- Detailed documents describing the project (site plan, drawings, certificates, descriptions)
- Expert opinion, if applicable
The systems must comply with the requirements of the Ordinance on Systems for Handling Substances Hazardous to Water (AwSV). This must be verified with the documents to be submitted.
If you want to place the ad online:
- You submit the notification via the online service.
- The water authority will check your documents for completeness and request any missing information or documents.
- The content requirements are also checked, which may also result in additional requirements.
- The authority may temporarily or definitively prohibit the project or issue a decision with conditions.
If you wish to submit the notification by letter or e-mail:
- You fill out the forms required for the notification and send them to the competent authority.
- The further procedural steps correspond to the online procedure.
- Notification of the construction, significant modification or measures involving a change in the hazard level of heating oil consumer installations Acceptance
- The notification must be made for the installation of the system or the significant change or
- For measures that lead to a change in the hazard level of the system
- The notification obligation only applies to systems subject to mandatory testing
- For the notification of heating oil consumer systems, the notification form or the online service "Notification of heating oil consumer systems" must be used.
- The notification must be submitted to the competent authority in writing at least 6 weeks in advance.
- Responsible: the lower water authorities of the districts or the independent cities.
In Schleswig-Holstein, the lower water authorities of the districts or independent cities are responsible.