Gehwegüberfahrt beantragen
Inhalt
Begriffe im Kontext
- Erlangung von Lizenzen, Genehmigungen oder Zulassungen im Hinblick auf die Gründung und Führung eines Unternehmens
Fachlich freigegeben am
Fachlich freigegeben durch
The purpose of the sidewalk crossing is to provide easy access to a property from the street for vehicles. If you are planning a project that requires the curb to be lowered, you will need a permit for the sidewalk crossing.
Sidewalk crossings, also known as driveways or curb cuts, are used to provide easy access to a property from the street for vehicles. If you are planning such a project that requires the kerb to be lowered, you will need a permit for the sidewalk crossing. Sidewalk crossings require a different construction or paving than the sidewalk and must be approved by the responsible authority. As a rule, work on public roads is commissioned by the city. In exceptional cases, you as the applicant may commission the work yourself from an approved specialist company.
- Main application
- In writing
- Evidence
- Scaled site plan
- Extract from property register
- Photos of the site
- Parcel map (optional)
- You yourself are the owner of the property.
- Alternatively, you have a power of attorney from the property owner.
- If you are allowed to carry out the construction yourself, the company commissioned must be an approved company.
- The height and visual continuity of the footpath is maintained.
- There are no interruptions to the sidewalk as a result of the measure.
Cost amount (variable): from EUR 50.00 to EUR 800.00
The costs are divided into a fee and production costs. The fee is charged by the responsible authority and depends on the respective fee schedule. The production costs depend on the size and nature of the footpath crossing (possibly also for tree replacement planting or light pole relocation). Both cost components must be borne by the applicant.
You can apply for a footpath crossing in writing (by post, e-mail, fax). It is also possible to use an online service. The procedure remains the same. The footpath crossing is constructed either by the responsible authority or by an approved company. The following procedure must be followed until the crossing is constructed:
- You apply for the footpath crossing with all the necessary documents to the responsible body.
- As soon as the application has been submitted, a check is carried out to determine whether there are any reasons why the footpath crossing should not be constructed.
- For more extensive measures, you must organize and carry out an on-site appointment in advance together with the responsible authority.
- Once your application has been approved, you will receive a notice of approval and can have the footpath crossing constructed (subject to possible conditions and requirements).
- You will be required to make an advance payment based on the production costs.
- Once the work has been completed, you will receive an invoice for payment of the remaining construction costs, less the advance payment made.
If the sidewalk crossing is constructed by the responsible authority:
- You do not need to take any further steps to complete the work.
If the footpath crossing is constructed by an approved company:
- The contracted company must apply for a traffic authority order for the measure.
After completion of the construction work, arrange a joint acceptance date with the responsible authority.
- The processing time distinguishes between application processing and construction of the footpath crossing.
- Application processing: usually promptly.
- Construction of the footpath crossing by the responsible body: at least 3 months.
- If the application is made in connection with a building project for which planning permission is required, the planning permission automatically includes permission to construct a footpath crossing. No separate application is required.
- The footpath crossing may not be constructed by the owner, for example with wooden beams, steel ramps or similar. This is an unauthorized intervention in the road space and may be punishable by law.
- Approval for the construction of a footpath crossing does not replace other necessary official approvals or entitlements, for example for the construction of a garage or a carport.
- Objection
- Further information on how to lodge an objection can be found in the notification of your application.
- Appeal to the administrative court
- Creation of footpath crossings
- Approval is required for the construction of a footpath crossing.
- The work for the construction of a footpath crossing is
- commissioned by the responsible authority
- carried out by an approved company (exceptional case).
- Responsible: Local road construction authorities