Anzeige von Anlagen zum Lagern von Heizöl EL / Notstromanlage

Thüringen 99129089261000, 99129089261000 Typ 3

Inhalt

Leistungsschlüssel

99129089261000, 99129089261000

Leistungsbezeichnung

Display of systems for storing EL heating oil / emergency power system

Leistungsbezeichnung II

nicht vorhanden

Leistungstypisierung

Typ 3

Begriffe im Kontext

nicht vorhanden

Leistungstyp

Leistungsobjekt mit Verrichtung

Leistungsgruppierung

Wasser (129)

Verrichtungskennung

Entgegennahme (261)

SDG Informationsbereiche

nicht vorhanden

Lagen Portalverbund

nicht vorhanden

Einheitlicher Ansprechpartner

Nein

Fachlich freigegeben am

30.12.2022

Fachlich freigegeben durch

Thuringian Ministry for the Environment, Energy and Nature Conservation

Teaser

You must notify the competent authority of the installation or modification of heating oil storage systems.

Volltext

If you want to set up or significantly modify a system for storing EL heating oil / emergency power system, this may be subject to notification under water legislation.

Erforderliche Unterlagen

  • Completed notification form
  • detailed documents describing the project (site plan, drawings, certificates, descriptions)
  • Expert opinion, if applicable

Voraussetzungen

The system must comply with the requirements of the Ordinance on Systems for Handling Substances Hazardous to Water (AwSV). This must be verified with the documents to be submitted.

Kosten

The amount of the fee is determined by the Thuringian Administrative Cost Regulations for the Ministry for the Environment, Energy and Nature Conservation. The amount of the fee depends on the type of installation and the associated inspection costs. The fee ranges from € 60 to € 2,500.

Verfahrensablauf

  • The developer must notify the authorities at least six weeks in advance of the construction or significant modification of a facility for handling substances hazardous to water.
  • If a facility requires a suitability assessment, construction may only take place after this has been granted.
  • The water authority examines the documents. It can temporarily or permanently prohibit the project or issue a decision with conditions.

Bearbeitungsdauer

  • It takes an average of one month to process a complaint.
  • If the documents are complete,
  • no other procedure such as a suitability determination or exemption in the water protection or flood area results from this, and
  • no conditions are imposed by the water authority in the form of a decision,
  • the project can be carried out after the six-week period has expired (fictitious approval).
  • If the project is the subject of another procedure, for example under the Federal Immission Control Act, notification under Section 40 AwSV is not required if the project is examined as part of the other procedure. In this case, the six-week deadline does not apply.

Frist

  • The developer must notify the authorities of the construction or significant modification at least six weeks in advance.
  • If an installation requires a suitability assessment, it may only be erected after this has been granted.

Weiterführende Informationen

nicht vorhanden

Rechtsbehelf

Contradiction

Kurztext

  • Heating oil system display
  • Display system for storing EL heating oil / emergency power system
  • Requirements: The system must comply with the requirements of the Ordinance on Systems for Handling Substances Hazardous to Water (AwSV). This must be proven with the documents to be submitted.
  • Deadlines:
    • Notification of the construction or significant modification must be submitted by the project developer at least six weeks in advance.
    • If a plant requires a suitability assessment, construction may only take place after this has been granted.
  • The amount of the fee depends on the type of installation and the associated inspection effort. The fee ranges from € 60 to € 2,500.
  • Responsible: Lower water authority at the locally responsible district office or the locally responsible independent city

Ansprechpunkt

nicht vorhanden

Zuständige Stelle

The lower water authorities at the locally responsible district office or the locally responsible independent city are responsible.

Formulare

Forms/online services available: Yes

Written form required: No

Informal application possible: Yes

Personal appearance necessary: No