Das neue FIM Portal wird aktiv weiterentwickelt. Feedback senden | Infos zu Datenquellen

Abgeschlossenheitsbescheinigung Ausstellung

Bremen 99012002012000 Typ 2/3

Inhalt

Leistungsschlüssel

99012002012000

Leistungsbezeichnung

Abgeschlossenheitsbescheinigung Ausstellung

Leistungsbezeichnung II

Apply for a certificate of seclusion according to the German Condominium Act / Bremerhaven

Leistungstypisierung

Typ 2/3

Begriffe im Kontext

Seclusion condominium (Synonym), Division of a house into apartments (Synonym), certificate of completion (Synonym), Certificate according to the German Condominium Act (WEG) (Synonym), Conversion into condominiums or even businesses (Synonym), Brhv (Synonym)

Leistungstyp

nicht vorhanden

SDG Informationsbereiche

nicht vorhanden

Lagen Portalverbund

  • Bauverfahren (2050500)
  • Hausbau und Immobilienerwerb (1050100)

Einheitlicher Ansprechpartner

nicht vorhanden

Fachlich freigegeben am

31.01.2025

Fachlich freigegeben durch

nicht vorhanden

Handlungsgrundlage

Teaser

You must apply for a certificate of seclusion if you wish to establish a separate property or assert a permanent right of residence.

Volltext

If you wish to establish separate ownership of an apartment or non-residential premises (e.g., commercial premises) or a parking space, you will need a certificate of separate ownership. You will also need this if you wish to establish the right to permanently occupy a certain apartment in the building (permanent right of occupancy).

The certificate of seclusion proves that

  • apartments or rooms not used for residential purposes are structurally closed off from other apartments and rooms, and
  • have their own lockable access.

Special ownership can also be established for parking spaces and parts of the property outside the building, such as terraces or garden areas. The special property must be clearly defined by dimension specifications in the construction drawings.

The certificate of seclusion is issued by the responsible building authority after checking your documents.

Erforderliche Unterlagen

  • Application for the issuance of a certificate of seclusion
  • Site plan

    In case of written application: in 3 copies

  • Construction drawings

    The construction drawing must be an as-built drawing for existing buildings.

    In case of written application: in 3 copies

  • Proof of ownership (current excerpt from the land register or purchase contract or administrator's contract)

Voraussetzungen

You must prove that you are either the owner or heritable building right holder of the rooms for which a certificate of seclusion is requested. Alternatively, you must provide credible evidence of your legitimate interest (e.g. purchaser).

The respective property must be located in the Free Hanseatic City of Bremen.

Apartments or rooms not used for residential purposes are closed off if they are structurally completely separated from other apartments and rooms (e.g. by walls and ceilings) and have their own lockable access directly outside, from a staircase or an anteroom. The access may not lead across another separate property or across a neighboring property without in rem security.

A locked apartment may include additional lockable rooms outside the respective enclosure.

Parking spaces as well as parts of the property outside the building (such as terraces and garden areas), on which special ownership is also to be established, must be clearly defined by dimension specifications in the construction drawing or in the partition plan.

Kosten

Gebühr: 73€
Basic fee
Gebühr: 28€
plus per apartment or part-ownership (e.g. garage parking space)

Verfahrensablauf

  • You write an application and submit it together with the required documents.
  • The application and the documents are checked for competence and completeness.
  • It is checked on the basis of the Condominium Act whether the requirements for the creation of a certificate of seclusion apply.
  • If all requirements are met, the certificate of seclusion will be sent to you together with the partition plan.
  • You will also receive a cost notification.

Bearbeitungsdauer

Not specified.

Frist

Not specified.

Weiterführende Informationen

nicht vorhanden

Hinweise

The certificate is issued regardless of building code regulations.

Rechtsbehelf

nicht vorhanden

Kurztext

Ansprechpunkt

nicht vorhanden

Zuständige Stelle

nicht vorhanden

Formulare

nicht vorhanden

Ursprungsportal